top of page

Services

​​

The basic objectives of the studies shall be to assist an organization to incorporate Energy Management System.

 

Energy Management System

Energy Management (1).jpg
Energy Management System

​

The basic objectives of the studies shall be to assist an organization to incorporate Energy Management System based on the ISO – 50001 Energy Management System Standard. The scope of work can cover

​

  • Conducting Awareness & Training Programs

  • Preparation of formats for Energy Management System

  • Evaluating Log Sheets to include key parameters impacting energy performance

  • Overviewing Present & Proposed Energy Savings Schemes & Proposals

  • Assessing & Analyzing MIS reports & Log Sheets

  • Periodic visit for measurement & analysis of key based on mutual discussions and as listed below

  • Preparation of ISO manuals and related documentation

  • Periodic visit for implementation of the standard

  • Any other areas based on mutual discussions

​

Periodic Visits (Independent Services and / or part of the Annual Contracts)

Pump Performance:

  • Measuring the flow with non-contact ultrasonic transit time flow meter

  • Gauging Pressure with digital pressure gauge

  • Determining Power with clamp on power meter

  • Computing Hydraulic Power to assess overall Efficiency of the pump (and motor).

  • Assessing the performance and suggesting ways for improvement, as applicable

  • Submitting the report

​

Chillers Performance:

  • Measuring the flow of chilled fluid with non-contact ultrasonic transit time flow meter

  • Gauging temperature drop across the chiller with digital temperature indicator

  • Determining Power with clamp on power meter

  • Computing Chilling Effect and assessing Specific Power Consumption as well as Energy Efficiency Ratio (EER)

  • Measuring the flow of cooling water with non-contact ultrasonic transit time flow meter

  • Gauging temperature rise across the condenser with digital temperature indicator

  • Computing Heat Load on the condenser and comparing the same with chiller data

  • Noting down the key parameters including suction & discharge pressure

  • Assessing the performance and suggesting ways for improvement, as applicable

  • Submitting the report

​

Cooling Tower Performance:

  • Measuring the flow of cooling water with non-contact ultrasonic transit time flow meter

  • Gauging temperature drop across the cooling tower with digital temperature indicator

  • Computing Heat Load on the cooling tower and delivered cooling effect

  • Determining fan Power with clamp on power meter

  • Noting down the key parameters including ambient dry bulb and wet bulb temperature

  • Measuring air flow rate to determine water to air to ratio

  • Assessing the performance and suggesting ways for improvement, as applicable

  • Submitting the report

​

Heat exchanger performance:

  • Measuring the flow of process fluid with non-contact ultrasonic transit time flow meter

  • Gauging temperature change across the heat exchanger with digital temperature indicator

  • Computing Heat transferred for the process side

  • Measuring the flow of the utility fluid with non-contact ultrasonic transit time flow meter

  • Gauging temperature change across the heat exchanger with digital temperature indicator

  • Computing Heat transferred for the process side and comparing the same with process data

  • Noting down the key parameters including pressure drops on both the sides

  • Assessing the performance and suggesting ways for improvement, as applicable

  • Submitting the report

​

Liquid Flow Rates

  • Measuring the flow with non-contact ultrasonic transit time flow meter at mutually decided locations

  • Submitting the report

​

Fans & Blowers Performance:

  • Measuring the flow with Anemometer or Pitot Tube

  • Gauging Pressure with digital manometer

  • Determining Power with clamp on power meter

  • Computing Pneumatic Power to assess overall Efficiency of the fan (and motor).

  • Assessing the performance and suggesting ways for improvement, as applicable

  • Submitting the report

​

Boiler performance:

  • Measuring Oxygen, Carbon Mono-Oxide & Temperature Contents in flue gas at Air Preheater / Economizer outlet

  • Measuring Oxygen Contents in flue gas at outlet of APH & inlet of ID Fan.

  • Computing Combustion Efficiency of the boiler

  • Estimating air ingress in Air Preheater, Bag Filter / Electrostatic Precipitator (ESP)

  • Submitting the report

​

Steam Trap Performance:

  • Checking the traps with thermal imager and / or ultrasonic trap leak detector

  • Qualitatively assessing the performance

  • Tagging the points (if the tags are provided by the plant)

  • Submitting the report

​

Thermopac performance:

  • Measuring Oxygen, Carbon Mono-Oxide & Temperature Contents in flue gas at Thermopac outle

  • Measuring Oxygen Contents in flue gas at outlet of APH & inlet of ID Fan.

  • Computing Combustion Efficiency of the thermopac

  • Estimating air ingress in Air Preheater, Bag Filter / Electrostatic Precipitator (ESP)

  • Submitting the report

​

Compressed Air Leakages:

  • Checking the entire system for identifying leakages with Ultrasonic Leak Detector

  • Qualitatively assessing & categorizing the leakages in major, moderate or minor

  • Tagging the points (if the tags are provided by the plant)

  • Submitting the report

​

Thermography:

  • Checking the entire electrical system for identifying hot spots

  • Capturing & Providing visual and thermal images for the hot spots

  • Qualitatively assessing & categorizing the hot spots in major, moderate or minor

  • Submitting the report

​

 

© 2022 by AN Tech Engineers and Consultant | All rights reserved.

bottom of page